|
Printable Page Email This Page
Case Studies
 News Release Granger Award ( PDF - 91KB) |
Pneumatech Dryer Helps Granger Energy Project Win Award
At the 12th Annual EPA Landfill Methane Outreach Program (LMOP) Conference and Project Expo in Baltimore, Granger Energy won an award for Multi-User Project of the Year. The project was designed to handle 7,200 SCFM of landfill gas (making it one of the largest in the country), with eventual plans to go as high as 12,500 SCFM. The reduction in greenhouse gas emission is equivalent to planting 10,600 acres of pine or fir forest, removing 8,500 passenger vehicles from the road or preventing Carbon Dioxide emissions from burning 108,700 barrels of oil each year. |
 PPR Case Study ( PDF - 23KB) |
Pulse Purge Regeneration Case Study
In January of 2008, a chemical plant In Lockport, NY purchased and installed a Pneumatech model PE-2100. The dryer was purchased to replace a competitive heatless dryer of similar size. The customer has a total of three compressors; two 150 HP load/no load compressors as well as a 100 HP compressor retrofitted with a Variable Frequency Drive. |
 Custom Gas Dryer ( PDF - 58KB) |
Custom Built Gas Dryer
A duplicate of a 2004 refrigerated air cooled chiller type digester type gas dryer was recently built for a Canadian customer. This dryer was custom designed for a low gas pressure application to keep the customers operating costs at a minimum. The dryer was designed for 172 SCFM at 5 PSIG minimum operating pressure, 140 Deg. F maximum inlet gas temperature and provides a 40 Deg. F pressure dew point. | | |